descriptive claim
As of end-2023, roughly 2,600 GW of generation and storage capacity sat in US interconnection queues --- more than double the existing US grid --- with typical wait times of ~5 years and completion rates below 20%.
desc_interconnection_queue_backlog
confidence 0.90
Warrants (2)
supports (2)
- Queued Up: 2024 Edition --- Characteristics of Power Plants Seeking Transmission Interconnection direct_measurementweight0.95
locator: Figure 1; summary tables
โ~2,600 GW of total generation and storage capacity in queues at end-2023โ
- Queued Up: 2024 Edition --- Characteristics of Power Plants Seeking Transmission Interconnection direct_measurementweight0.90
locator: Completion-rate and duration analysis