descriptive claim
Electricity generation and transmission are near-term bottlenecks for datacenter buildout.
desc_grid_constraint
confidence 0.80
Warrants (2)
supports (2)
- Queued Up: 2024 Edition --- Characteristics of Power Plants Seeking Transmission Interconnection direct_measurementweight0.85
locator: Queue size and completion-rate figures
- 2025/2026 Base Residual Auction Results direct_measurementweight0.80
locator: 2025/2026 BRA clearing-price escalation