ai-for-less-suffering.com

← all sources

source · filing

2025/2026 Base Residual Auction Results

src_pjm_2024_capacity

reliability
0.95

authors: PJM Interconnection

published: 2024-07

Notes

RTO primary-auction document, audited. Direct market evidence of AI/datacenter load tightening the eastern US grid.

Warrants from this source (2)